Tag Archives: Clairmont Avenue

Design Review Alert

It’s historic too

Tomorrow morning at Design Review Committee, the conceptual design for the proposed Walgreens drugstore on Clairmont Avenue South will be presented. The most recent plan, informally shown to neighbors and community stakeholders, was discussed in a previous post here.

The meeting will be at 7:30 AM, Young and Vann building, 1731 First Avenue North, 3rd Floor.

This proposal is important because it accommodates the historic Fire Station No. 22, while demolishing several structures in-between the Fire Station and the mid-century modern office of Henry Sprott Long Architects (in continuous operation at this location for about 50 years), shown in the photo above. The drugstore’s relationship to both historic buildings, its new parking lot and drive-through, and its formal character along Clairmont should be discussed in the morning.

The public is invited to attend.

Walgreens, Phase 2

A softer approach

Yesterday Connolly Net Lease, the developer who has acquired the historic Fire Station No. 22 and several adjacent parcels along the 3100 block of Clairmont Avenue South, held a charrette to help determine what a new Walgreens would look like. Coming off of a contentious earlier effort (which involved demolishing the Fire Station), the new plan is at first glance more pleasing to neighbors and others: the Fire Station has been saved, and will house two of the existing businesses that will be demolished on adjacent lots (Bogue’s Restaurant and Triple Platinum Salon). Connolly said the famous Bogue’s neon sign will be preserved and move it to the Fire Station; a neighborhood landmark is preserved and will have two local businesses inside. Good.  But what about the plan for the new structure and site layout?

Context is complex

The largest issue here is not the architecture per se (although it’s important), but the site layout itself. Above is Clairmont Avenue, looking west from the Fire Station. Note all the setbacks along the street–except for Bogue’s, whose setback is perhaps 5 feet or so, all structures are placed back 10-30 feet from the front property line. This is due in part to the fact the street was initially laid out residentially, with houses, porches, and apartment buildings. And lawns.

Sophisticated respect for context, ca. 1960

About 1960, the architectural firm Henry Sprott Long moved from their downtown offices to the leafier region of Clairmont Avenue, which by that point had become a less desirable residential address. They built an international style gem, with exposed steel beams, plate glass, stone veneer, and a flat roof (above). However, they were careful to respect their residential neighbors, preserving trees, keeping the scale modest–and setting the building back to match the adjacent houses.

Still historic in its own right

At the design charrette, the principals of Blackmon Rogers Architects showed a site plan that has a +/- 13,500 square foot Walgreens moved all the way to the western edge of the lot, and pulled out to the sidewalk with no setback. This awkwardly hems in Henry Sprott Long. In many cases, the correct “urban” and “pedestrian-friendly” location of a commercial building is right at the sidewalk. In this case, we’re not as sure.

A bit too close for comfort

In the architect’s quick sketch prepared yesterday above (please note: these are very early sketches in the process), an option for the new Walgreens facade on Clairmont is illustrated. They have made an effort to bring down the height to relate to Henry Sprott Long seen at the left; what you don’t see is the shadow that would be cast on the older building which is set so much further back. And to the other side of the Walgreens is…

an urban void

…a large surface parking lot, the extent of which can be seen in the second part of the sketch above (note the diminutive Fire Station to the far right). Having this much surface parking running along Clairmont is not good. If I were to redesign this site, I would place Walgreens more in the center between the international style and Spanish-style historic structures (and yes, they are both historic); I would make it longer and skinnier along Clairmont to put more mass on the street; I would set it back a very modest amount from the sidewalk; and parking would be contained at the rear. As it is, the Fire Station feels marooned in isolation at the end of the sea of parking, and Henry Sprott Long has the opposite problem: it’s being strangled by its much larger new neighbor.

Contextual in Oak Park

While certain participants yesterday asked for “historical” elements in the design, what actually emerged as a favorite “prototype” was the new part of the Oak Park, IL Walgreens, shown above (the other part is a renovated existing historic structure). It’s decent, if conventional, corporate architecture. It’s much better than your standard Walgreens, which is good. And it’s good the neighborhood gets to have input into materials. It’s also good activists were able to save the Fire Station from demolition, and the developer plans to relocate local independent businesses there.

Unfortunate siting--but still early

But the neighborhood should also insist on a better site plan. The current plan (sketched crudely above by this author) does a disservice to both historic buildings. The architects are at least on the right track with a “21st century” style that doesn’t cheapen the Fire Station by mimicking it.  Hopefully, the developer will reconsider the site plan so that the block can feel more whole, and the beautiful little modernist building can breathe again.

[Thanks to Blackmon Rogers for allowing us to show the elevation sketches; Oak Park Walgreens pic courtesy of Walgreens]

Saved?

The City’s Economic Development Committee this afternoon unanimously voted to recommend the Walgreen’s project on Clairmont Avenue and 32nd Street to the full Council.

Still fighting fires in 1976

Originally Walgreen’s had planned to demolish Fire Station No. 22–and two neighboring long-time businesses, Bogue’s Restaurant and Clairmont Auto Repair–for a new store and parking lot. After an explosion of neighborhood opposition to the demolition, and frustration at the lack of public awareness of the City sale of this property, Walgreen’s amended its proposal. Now, the company promises in writing to preserve the Fire Station and make efforts to move Bogue’s into it, or find another neighborhood tenant. The new drug store would be placed in the middle of the block, leaving the historic corner building in its role as gateway marker to the Highland Park, South Avondale, and Forest Park neighborhoods.

Once Walgreen’s changed their plan to include preservation (the community had reminded the developer, Connolly Net Lease, that Walgreen’s had agreed with the National Trust to not demolish buildings on the National Register some years ago), a lot of opposition died away. While it is true that the current proposal is immensely better than the previous, it is probably important to remain a little skeptical–this large corporation had no initial intent to save the fire station or help displaced businesses. Let’s hope their new spirit of community cooperation is genuine.

Walgreen’s committed to holding a design charrette for the proposal, with public input. They have also engaged David Blackmon of Blackmon Rogers Architects to lead the design process. Here’s hoping for an inspired design for the new building; carefully planned and shielded parking; clear pedestrian emphasis at entry points; a skilled restoration of the fire station; and a commitment from the City to help both Bogue’s and Clairmont Auto find new homes. Oh, and a new policy that whenever the City is selling property–especially property on the National Register–they at least put up a “For Sale” sign, so the community, and not just RFP insiders, is aware and able to make proposals.

A big step in the right direction. Now come the important details. Stay tuned.

Putting out fires

An open letter to Kathy Okrongley, President of Connolly Net Lease, LLC–the developer of a proposed Walgreen’s drugstore at the site of historic Fire Station No. 22, Bogue’s Restaurant, and Clairmont Auto on Clairmont Avenue South:

Dear Ms. Okrongley:

I read with interest the article in today’s Birmingham News, where you state you want to work with the neighborhood and the Design Review Committee to come up with a proposal acceptable to all. Given the current neighborhood aversion to the project as depicted so far–tearing down the historic Fire Station No. 22 and other small, local businesses including the 70-year-old Bogue’s Restaurant, and replacing them with a generic, boxy Walgreen’s drugstore, asphalt parking lot, and drive-through–I welcome this willingness to explore alternatives. I know the members of the Facebook protest site, as well as the brand-new civic group I Believe in Birmingham, are also cautiously optimistic about your next steps.

A second chance?

First: the excellent points you discuss. You say you’re an architect by training, and have an appreciation for historic structures. You say you’re interested in developing a sustainable design, possibly with LEED certification. You say that you are seriously considering saving all or part of the Fire Station and incorporating it into the design. You also say you will work to find another neighborhood location for Bogue’s, carefully restoring the historic neon sign at a new location.

As Alison Glascock, Highland Park neighborhood president states in the article, a lot of opposition “would end” if the above goals were all achieved.

Second: the note of caution: I’m reading good things, but an actual detailed plan is yet to be presented. I don’t want some clumsy pastiche that makes a few “references” to the historic Spanish-style architecture of the Fire Station. I don’t want Bogue’s and Clairmont Auto to just disappear for a parking lot–I want an earnest effort to relocate them. I know the corporation, Walgreen’s, that you represent has the resources to commit to fine design, neighborhood involvement, and relocation of existing businesses–if the will is truly there.

Ms. Okrongley, there are plenty of local community leaders and neighbors–and designers (this author included)–who’d be delighted to work with you to make this a winning project for everyone. Please understand that if the Walgreen’s effort falls short of your newly stated intentions, I feel the City has an obligation to reopen its RFP process to other developers who stand by committed to preserving the Fire Station and local businesses. I’m eager to see your next step.

Yours sincerely, etc.

Walgreen's CAN do urban, pedestrian, and contextual. And historic neon.

[thanks to acnatta for the Bogue’s shot, and willcrusta for the Walgreen’s in New Orleans]

4-Alarm Shock

An architectural gem

Just when we had our hands full with a proposed drive-through Chick-Fil-A in Five Points, along comes this punch in the jaw at Design Review this morning: the historic Fire Station No. 22, recently vacated, is on the table for demolition. It would be replaced with a Walgreen’s drugstore and parking lot. And a drive-through. On yet another important, gateway corner (Clairmont Avenue and 32nd Street).

Except this time the owner isn’t proposing tearing down a Ruby Tuesday’s built in the 1990s, but a wonderful Spanish-style fire station built in the 1920s. And the owner just happens to be the City of Birmingham, which is perhaps the most shocking part of this. Hasn’t this City learned enough about tearing down historic structures and what that does to a neighborhood fabric? And to a sense of place?

A dismal idea

To their credit, the Design Review Committee refused to approve this conceptual site plan, and insisted Walgreen’s return with exterior elevations suitable for an urban environment, including pedestrian-friendly storefront and sidewalk entries (no exteriors were presented today). Alison Glascock, Highland Park neighborhood president, stood to commend the Committee for its stance.

City of Birmingham–you need to be actively seeking creative redevelopment of the historic fire station, not tearing down another piece of our history to replace with banal, suburban-style architecture! And if you need an architect to help figure that out, I know where to find one.

(thanks to Birmingham Firefighters Local 117 for the historic photo, and to LAI engineering for the Walgreen’s plan)

UPDATE: INSPIRATIONS

Not that there is one right way to go here, but I feel strongly about the historic structure and the accessible nature of its scale.  Just a few pieces of eye candy to get the creative juices flowing here:

Let’s think outdoor seating — bridging Lakeview and Forest Park:

stopping in for pizza...

Love this restaurant concept in an old fire house in LA:

Firehouse themed restaurant!

And this is just for fun but to live in a firehouse!!

note the fire pole hole!

(thanks to Engine Co. No. 28, insidetheperimeter, and designpublic for the above images)

UPDATE #2: BOGUE”S RESTAURANT TO BE DEMOLISHED UNDER THIS PLAN

The Walgreen’s plan would not just take out the neighboring service station, but also Bogue’s Restaurant, an historic fixture on Birmingham’s Southside for many decades.

The end of an era?